- ACCIONA
- Projects
- Industrial
- Palos de la Frontera LNG Storage Tanks
The project consisted of the construction of three liquefied natural gas storage tanks with a unit storage capacity of 155,000 m3, for subsequent supply to the pipeline network or loading onto tank trucks.
The tanks are built of cryogenic reinforced and post-tensioned concrete.
This plant will cover peak and emergency demands in Baja California, and is the first of this kind of technology in the state.
ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant.
View ACCIONA Social Networks