- ACCIONA
- Projects
- Industrial
- Kugira Floating Dock
The Kugira floating dock is 74 m long, 49 m wide and 56 m high and casts 66 m x 24 m x 21 m concrete caissons. It was used to build Spain's most important port projects, which include the Algeciras dry dock in Cádiz. Recently, it has built Açu Port in Rio de Janeiro, with a length of 2.8 km.
This plant will cover peak and emergency demands in Baja California, and is the first of this kind of technology in the state.
ACCIONA Industrial carried out the design, supply, construction and start-up of a 42-MW power generation plant.
View ACCIONA Social Networks