- ACCIONA
- Projects
- Construction
- Roads, Bridges and Special Structures
- Wroclaw Bridge
The project comprised building a 612-m cable-stayed bridge over the main channel of the river, plus two overpasses, measuring approximately 611 m and 521 m on each side of the river, making a total length of 1.75 km.
The central pier, located on Rędzińska Island in the middle of the river, is 122 m tall, the highest structure of its kind in Poland. The bridge was the first in Poland to be fitted with sensors to detect damage or deterioration in any of its components.
The Windsor-Essex Parkway project is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor.
In September of 2008, ACCIONA was contracted by Quebec’s Ministry of Transport to design, finance, build, operate and maintain the new Autoroute 30 (A30 Express) toll road along Montreal’s south shore. The completed A30 was opened to traffic on December 2012.
View ACCIONA Social Networks