A remarkable feature of this bridge structure are the two divided superstructures (composite superstructures consisting of a light-weight steel girder grillage and a prefabricated concrete deck), each 17.7 m wide.
Single pylons are stabilized in the transverse direction by cables like masts of a sailboat; stabilization of the pylons between the two primary widths via longitudinal cables between the pylon head and the crossing point of the superstructure with the neighbouring pylons.
The Windsor-Essex Parkway project is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor.
In September of 2008, ACCIONA was contracted by Quebec’s Ministry of Transport to design, finance, build, operate and maintain the new Autoroute 30 (A30 Express) toll road along Montreal’s south shore. The completed A30 was opened to traffic on December 2012.
View ACCIONA Social Networks