The main feature of this project was the construction of two lines with a total length of 32 km and 25 stations, such that 40% of the developed area or area suitable for development to be located at a distance of less than one kilometre from any of the system's stations.
Line A runs through the city, from Niquia to Itagüi, a distance of 23.22 km, of which 16.72 km are at grade and 6.50 km are built as a viaduct. The project was completed in March 1997.
ACCIONA was the lead partner of the Transcity Joint Venture, for the design, build, operate and maintenance (10 years) of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA is the Principal Design and Build JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.