The project can be divided into two large parts: Pumping and load breaking, land outfall
The pumping system consists of a 102-m trench containing two 1,200-mm cast-iron pipes that convey the water to the inlet of the land outfall. At this point, a large load breaking inspection chamber is installed, such that from this point, the water flows by gravity through the outfall, which has a length of 7,344 m and an internal diameter of 3 m. The tunnel excavation was performed with a tunnel boring machine (TBM).
The upper part of the chamber will be developed to create a recreational area for urban use.
ACCIONA was the lead partner of the Transcity Joint Venture, for the design, build, operate and maintenance (10 years) of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA is the Principal Design and Build JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.