- ACCIONA
- Projects
- Construction
- Concessions
- Trambesòs Light Rail
There will be a total of 28 stations, 11 of which link to metro and suburban rail stations, plus a facilities building will be constructed. The structure consists mainly of at-grade track and is completely integrated with Barcelona's main public transport network. The fleet consists of eighteen 32.5-m long carriages with capacity for 230 passengers.
Almost the entire layout of the LRT runs through the downtown core of Barcelona, Spain's second-largest city and one of the most densely populated cities in Europe.
The project involves the design, construction, financing, operations and maintenance as well as the provision of rolling stock. Payments are based on an availability mechanism until handover in 2032.
The project is currently operational, since construction completion in 2008.
The Windsor-Essex Parkway project is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor.
In September of 2008, ACCIONA was contracted by Quebec’s Ministry of Transport to design, finance, build, operate and maintain the new Autoroute 30 (A30 Express) toll road along Montreal’s south shore. The completed A30 was opened to traffic on December 2012.
View ACCIONA Social Networks