    Champotón Bridges

    The construction for the Government of the State of Campeche started in July 2009 and lasted 19 months.

    The construction has a total length of 837 m. The bridges make up a total of four structures, with lengths of 195 m, 111 m, 167 m and 364 m, respectively.

    General Information

    Location
    Campeche (Mexico)
    Contract type
    Construction
    Infrastructure
    construction of four bridges. The lengths are, respectively, 195 m, 111 m, 167 m and 364 m.
    Year of project completion
    2011

    Image Gallery

    discover other flagship projects

    The Rt. Hon. Herb Gray Parkway

    Windsor, Ontario (Canada)

    The Windsor-Essex Parkway project is part of the proposed plan to connect Highway 401 in Ontario to Interstate 75 in Michigan, by way of a new Canadian inspection plaza and bridge crossing being constructed by the Federal Government in West Windsor. 

    Autoroute A-30 Express

    Montreal, Qebec City (Canada)

    In September of 2008, ACCIONA was contracted by Quebec’s Ministry of Transport to design, finance, build, operate and maintain the new Autoroute 30 (A30 Express) toll road along Montreal’s south shore.  The completed A30 was opened to traffic on December 2012.

    Move up