- Guadarrama Tunnel
The project consisted of the construction of a railway line for trains with a speed of 350 km/h. The $780-million project consisted of the construction of a railway line for trains with a speed of 350 km/h, including two tunnels of 15 km and 13 km in length, and 8.5 m of connection galleries every 250 m. Half of each tunnel tube was excavated using two double-shield TBMs.
The project includes infrastructure, superstructure, civil works for railway installations, replacement of utilities and services, environmental integration, non-railway installations and ancillary works.
ACCIONA Infrastructure was lead partner of the Transcity Joint Venture, for the design, construction, operate and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA Infrastructure is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.
View ACCIONA Social Networks